Washington, D.C. · Est. 2021 Project controls & construction IT CareersPartnersProgram RatesMedia512-908-5223Data date
Program Rates · Repeat and similar projects

Built it once? The next one costs less.

The next data hall, the second substation, another school in the bond program. When the work repeats, the controls should not start from zero. Keep the same team at a highly discounted Program Rate and pay for setup once.

You pay for setup
Once
Team on every project
Same
Proven templates in place
Day one

Who it is for.

Open to every client with a repeat or similar project: owner or builder, public or private.

01

Data center campuses

The next hall, the next building, the next campus. Power, cooling and commissioning logic proven on the first hall carries straight over.

02

Infrastructure and utility programs

Substations, pump stations, pipelines and roadway packages delivered year after year under capital plans that repeat.

03

Healthcare systems

Clinics, outpatient centers, operating room renovations and towers across a system. Same standards, same equipment planning, same activation logic.

04

Bond and campus programs

School districts, universities and agencies building a list of similar buildings. The fifth one should not cost what the first did to set up.

05

Industrial and retail rollouts

Plants, lines, distribution centers and stores built to a prototype. One template per prototype, adjusted for each site.

06

Builders with repeat clients

General contractors and construction managers who build the same kind of project for the same owner again and again.

What carries over

The hard part is already done.

  1. 01

    Work breakdown structure

    The WBS that matches how you build, estimate and report. It took weeks to get right the first time. The next time it takes an afternoon.

  2. 02

    Logic libraries

    Tested sequences for structure, MEP, commissioning, inspections and turnover. The next baseline starts from logic that already held up in the field.

  3. 03

    Cost codes and risk registers

    Cost codes that tie budget to schedule, and a risk register built from what actually happened last time, priced and ready.

  4. 04

    Dashboards and data pipelines

    Power BI reports, data models and schedule quality checks your leadership already knows how to read. No new format to learn.

  5. 05

    Lessons learned and the same people

    Schedulers and cost engineers who know your standards, your contractors and your approvals, carrying last project’s lessons into this one.

How it works.

01

Tell us what repeats

Share the first project and the ones coming next: how many, what type and roughly when. One conversation is enough to start.

02

We scope the first project

The first project is priced normally. It is where we build the WBS, logic, cost codes, risk register and reporting you will reuse.

03

Every next one at a Program Rate

Each repeat or similar project starts from the proven setup with the same team, at a highly discounted rate agreed in writing up front.

04

It gets sharper each time

Actual durations and costs go back into the libraries after every project, so each baseline is tighter and each forecast more reliable than the last.

In practice · How a program usually unfolds

The second hall starts from the first.

On a typical campus program, the first building is where the work happens: the WBS, the commissioning logic, the cost codes, the dashboards. When the second building is announced, the baseline is drafted from that library in days, the same scheduler runs it, and leadership compares both buildings line by line on day one.

Once
Setup paid
Same
Coding on every project
Side by side
Comparable performance

What you get.

A lower rateProgram Rate

A highly discounted rate on every repeat or similar project, agreed in writing before the work starts.

A faster startMobilization

A baseline, cost structure and reporting in place in a fraction of the usual time, because the templates already exist.

The same teamContinuity

The people who learned your standards on the first project stay on the next one. No new faces to brief.

Comparable dataBenchmarks

Every project coded the same way, so you can compare durations, costs and performance across your whole program.

Questions about Program Rates.

How much is the discount?

It depends on how similar the projects are and how many there will be. We agree the Program Rate in writing when we scope the first project, so you know it before you commit.

Do the projects have to be identical?

No. Similar is enough: the same facility type, the same owner standards or the same delivery model. If the WBS and logic carry over, the rate applies.

We already worked with AdenTurton. Does that count?

Yes. If your next project is similar to one we have already set up for you, ask for a Program Rate before we scope it.

Is this only for owners?

No. Program Rates are open to every client with a repeat or similar project, including general contractors, construction managers and public agencies.

Which services does it cover?

Any of our 16 services, from baselines and earned value to controls systems and dashboards. The more of the setup that repeats, the more the rate reflects it.

Program Rates

Ask for a Program Rate.

Tell us what you built and what is coming next. A senior project controls lead replies within one business day. Or email conversations@adenturton.com.