Energy · Power & Renewables

Interconnection to COD, on the date.

Solar and storage portfolios, substations, transmission and plant upgrades. Interconnection dates, transformer deliveries and the commercial operation date decide the economics, and lenders read every one.

Projects shown
2
Their capital value
$1.61B
Services, one team
16
Power & Renewables

What goes late on the way to COD.

Three places the date is usually lost, long before anyone admits it.

01

Interconnection waits for no one

Backfeed, interconnection and testing dates are set with the utility and the grid operator. Miss a window and the next one can be months away.

02

The transformer is the schedule

Main power transformers, breakers, inverters and batteries travel long supply chains. Delivery risk belongs in the logic, with float measured, not in a slide.

03

COD carries the money

Power purchase agreements, tax credits and financing hang on the commercial operation date. Every late day has a price someone has already written down.

Power & Renewables

The power work we control.

  1. 01

    Solar and storage portfolios

    Several sites at once, with interconnection, mechanical completion and COD tracked site by site.

  2. 02

    Substations and transmission

    Grid work with utility outage windows, relay testing and energization dates on the critical path.

  3. 03

    Plant upgrades and outages

    Combined-cycle and thermal plant work timed to outage windows and finished before the summer peak.

  4. 04

    Wind

    Foundations, turbine erection and collection systems, with weather days modeled rather than guessed.

What we measure

The numbers we watch here.

Every update, these four tell you whether the date is holding or quietly slipping.

01

Float to COD

Total float on each site’s path to commercial operation, reported every update to owners and lenders.

02

Major equipment need dates

Transformer, breaker, inverter and battery deliveries against the date the logic needs them, site by site.

03

Energization milestones

Backfeed, interconnection and testing dates tracked against the utility’s windows, with dependencies shown.

04

P80 COD drift

How the risk-adjusted COD moves between reviews, because a drifting P80 means risk is being realized, not retired.

The services that carry the weight.

Four of our 16 services do most of the work in this market.

Schedule & Cost Risk AnalysisPlan

A risk-adjusted COD with interconnection and equipment risk modeled, ready for lenders and the board.

Integrated Master SchedulingPlan

Portfolio schedules that show every site’s path to COD in one view, with shared risks visible.

Project Controls & Earned ValueControl

Earned value and cost reporting built for owners, lenders and tax equity partners.

Delay Analysis & ClaimsRecover

Clear analysis when equipment, utility work or changes push COD and someone has to carry the cost.

Questions owners ask us.

Can you schedule a multi-site portfolio?

Yes. Each site gets its own schedule, rolled up into one portfolio view so shared risks and shared equipment show up early.

Do you report to lenders and investors?

Yes, with the owner’s approval, using reports that trace back to the native schedule file and a P80 date with its drivers written down.

Is there a better rate for repeat sites?

Yes. Similar sites in a portfolio suit a highly discounted Program Rate, because the logic and reports are already built.

Power & Renewables

Show us the date that matters.

Send us the power & renewables project, the current schedule and the date you are protecting. A senior project controls lead replies within one business day.