Plan · Integrated Master Scheduling

Programs slip between contracts.

Design, permits, utilities, procurement, every construction package and the owner’s own work, tied together in one integrated master schedule. When one piece moves, you see what it moves next, and who has to act.

Why programs lose time.

01

Ten schedules, no single truth

Every contractor reports its own dates against its own data date. Nobody owns the handoffs between packages, and handoffs are exactly where programs slip.

02

The owner’s work is off the page

Utility service, permanent power, IT fit-out, furniture, licensing and move-in sit outside every contract. They still decide the opening.

03

Green until it is red

Executives see a slide of green milestones until the month one turns red. By then every option to recover costs real money.

How we work

How we integrate.

  1. 01

    Map every handoff

    Access, utilities, data, inspections, equipment and turnover: each point where one party hands work to another becomes a tied interface milestone.

  2. 02

    One coding standard

    A shared WBS and activity code dictionary, so every contractor schedule rolls up without retyping a single line.

  3. 03

    Link, never copy

    Contractor schedules feed the IMS through controlled interface milestones. Updates flow monthly instead of being rebuilt by hand.

  4. 04

    Find the program critical path

    The driving path often runs through an owner decision, a utility or a permit, not through any one contractor. We show it plainly.

  5. 05

    Report at three levels

    Activity detail for the controls team, package view for managers, one page for the executive committee. Same data underneath all three.

What you get.

Scoped to your project and delivered in native files your team owns.

Integrated master scheduleProgram

One logic-tied schedule covering design, permits, procurement, construction, owner work, commissioning and activation.

Interface registerHandoffs

Every handoff between parties with an owner, a need date and a status, reviewed in every monthly meeting.

Scheduling specificationContract language

Rules that tell every contractor how to build, code, update and submit its schedule, ready to drop into the next bid package.

Program critical pathMonthly

The real driving path across every package, with float to each key milestone stated in days, not colors.

Executive summaryBoard ready

One page of milestones, trends and decisions needed, tied directly to the detailed schedule.

In practice · Where an IMS earns its keep

The permit was the critical path.

On multi-contract programs the longest path rarely belongs to one builder. It runs through a utility energization date, a permit or an owner decision that sits in nobody’s scope. An IMS puts that activity on the page with an owner and a date, months before it becomes the reason for a late opening.

1
Schedule for the whole program
3
Reporting levels, one dataset
Monthly
Interface review

Questions owners ask us.

Do our contractors have to change software?

No. We set coding and submission rules and integrate through interface milestones. Each contractor keeps scheduling the way it does today.

What size program needs an IMS?

Any program where more than one contract, or the owner’s own work, can delay the finish. The value grows with every party you add.

Can you take over an IMS that already exists?

Yes. We start with a review of the current file, repair logic and coding, then run it month to month.

Our program has many similar projects. Is there a better rate?

Yes. Repeat projects reuse the coding, interfaces and templates built for the first. Ask about a Program Rate.

Related services

Integrated Master Scheduling

Show us the program. We will find the path.

Share the project, the latest schedule and the date that matters. A senior project controls lead replies within one business day.