Plan · Cost Estimating & Budgeting

A budget the board can interrogate.

Independent estimates and control budgets built from quantities, current pricing and the schedule. When a director asks where a number came from, the answer is one click away, not one week away.

Where budgets go wrong.

01

The number came first

A budget set to match the funding, then defended for two years. Every change order after that feels like a surprise, even when it was predictable.

02

Time was never priced

Escalation, general conditions and extended overhead all follow the calendar. An estimate built without a schedule misses the cost of a long job.

03

Contingency with no story

A round percentage nobody can explain gets spent early and fought over late. It should be the sum of named, priced risks.

How we work

How we estimate.

  1. 01

    Quantities, not rules of thumb

    We take off from the current design. Where design is incomplete, the assumption is written down and priced, not buried in a square-foot rate.

  2. 02

    Coded to match the schedule

    Estimate and schedule share one WBS and one set of cost codes, so the budget loads straight into P6 and earned value works from day one.

  3. 03

    Escalation by the calendar

    Cost is spread over the real construction period and escalated to the month the money will actually be spent.

  4. 04

    Reconcile every milestone

    At each design stage we walk from the last estimate and the contractor’s number to ours, line by line, and explain every movement.

  5. 05

    Contingency from the risk register

    Each major risk carries a cost range. Contingency becomes a sum of known exposures that is easy to track and defend as it draws down.

What you get.

Scoped to your project and delivered in native files your team owns.

Independent estimateConcept to CDs

A quantity-based estimate at each design milestone, with assumptions and exclusions written in plain language.

Control budgetCost loaded

The approved budget by WBS and cost code, ready to load into the schedule and the cost system without rework.

Reconciliation reportVariance

A clear walk from the previous estimate or the GMP to ours, so a large gap becomes a short list of decisions.

Cash flow forecastFunding

Monthly spend tied to the schedule, so finance knows when draws, bonds and grants will be needed.

Priced risk registerContingency

Named risks with likelihood, cost range and owner, summed into a contingency a board member can follow.

In practice · Before the GMP is signed

The gap was eleven decisions.

A typical GMP review starts with one alarming number: the contractor’s price against the owner’s budget. We reconcile scope, quantities, allowances, general conditions and contingency until the gap turns into a short list of decisions with a dollar value beside each. Owners sign knowing exactly what they bought.

1
WBS shared with the schedule
Line by line
Reconciliation
P80
Contingency basis on request

Questions owners ask us.

Are you independent of the contractor?

Yes. On any one project we work for one party. We have no stake in the price, only in whether it is right.

Can you check a contractor’s GMP?

Yes. We review scope, quantities, unit costs, allowances, general conditions and contingency, then give you a reconciliation and the questions to settle before signing.

Why does an estimator care about the schedule?

Because time is money on a construction site. Escalation, general conditions and overhead all follow the calendar. Try the Cost of Delay calculator in our Controls Lab.

Related services

Cost Estimating & Budgeting

Send the number. We will show you its parts.

Share the project, the latest schedule and the date that matters. A senior project controls lead replies within one business day.