We measure what matters to keep your project on track.
Independent CPM scheduling, earned value, cost and risk control, recovery and claims, plus the systems that carry the data. We show you the slip while it is still float, not after it is a headline.
- SPI
- 0.96
- CPI
- 1.02
- Float left
- 15d
Most projects don’t fail in the field.
They fail in the
forecast.
The slip starts as float.
A late delivery rarely moves the finish on day one. It eats float quietly, until the critical path flips and the date goes with it.
Optimism compounds.
Every update that rounds progress up borrows from the next one. By the time SPI reads 0.85, the cheap recovery options are gone.
We measure it early.
Independent updates, earned value and risk analysis give leadership defensible data while there is still time to act on it.
- 20 yrs
- Founder in complex programs
- 2021
- Founded in Delaware
- 16
- Controls and IT services
- 40
- Confidential projects
One late delivery. Watch it travel.
A sample data center schedule, eleven activities, real critical path math. Pick an activity, make it late, and see where the float goes and what the delay costs.
- Ready for service
- Day 230
- Finish moves
- 0 days
- Float absorbed
- 0 days
- Revenue at risk
- $0
Switchgear delivery has 15 days of float in the baseline. Add days and watch it disappear.
Plan it. Control it. Prove it.
16 services in four groups. Bring us in before the first activity is drawn, or the week the dates stop holding.
- Planning & Scheduling
- Integrated Master Scheduling
- Cost Estimating & Budgeting
- Schedule & Cost Risk Analysis
- Project Controls & Earned Value
- Schedule Updates & Progress
- Cost Control & Forecasting
- Change & Contract Management
- Owner's Representative & PMO
- Embedded Controls Teams
- Controls Systems Implementation
- Reporting & Dashboards
- Construction Data & Integration
Proof, on schedule.
40 confidential projects across data centers, healthcare, infrastructure and industry. Owners stay private. The dates do not.
Trauma Center & Critical Care TowerA Level I trauma center rising beside the one it replaces. One integrated schedule keeps the helipad, the ICUs and the move-in weekend on the same critical path.
Combined Sewer Overflow Storage TunnelA tunnel boring machine advances a few dozen feet a day. Every one of those feet is measured against the baseline, so the river cleanup date stays real.
Gigawatt-Scale AI Data Center CampusFour buildings, six hundred megawatts and tenants who signed for capacity by the quarter. Every week saved on the critical path is revenue the owner keeps.
Powered Shell to Colocation Data Center ConversionAn empty shell turned into two live data halls in eighteen months. The first tenant moved in on the date in its lease.
Data Center Campus Substation & Power DeliveryNo power, no data center. The substation was energized ahead of the first data hall, so the utility was never the reason for a late opening.
300mm Wafer Fab Cleanroom Fit-OutTool move-in is the date the whole fab is built for. Every cleanroom zone is scheduled backward from the first tool on its pad.
Highway Bridge Replacement ProgramTwenty-seven aging bridges, replaced in an order the traffic can survive. One program schedule decides which lane closes when.
Emergency Operations & 911 CenterA 911 center cannot go dark for a single call. Cutover from the old floor to the new one was planned to the minute.
Wale OsobaFounder and Chief Executive OfficerMy background in data center and infrastructure construction taught me that without disciplined controls, vision is just an estimate.
We don’t build the project. We ensure it is built on time and on budget.
Built it once? The next one costs less.
Another data hall, another clinic, another school in the same bond program? The WBS, logic library, cost codes, risk register and dashboards already exist. We put the same team on each repeat or similar project at a highly discounted Program Rate.

Your forecast is a promise. Let’s keep it.
Send us the project, the schedule and the date that matters. A senior project controls lead replies within one business day.