Washington, D.C. · Est. 2021 Project controls & construction IT CareersPartnersProgram RatesMedia512-908-5223Data date
Project controls · Construction IT · Washington, D.C.

We measure what matters to keep your project on track.

Independent CPM scheduling, earned value, cost and risk control, recovery and claims, plus the systems that carry the data. We show you the slip while it is still float, not after it is a headline.

Forecast checkSample data hall
SPI
0.96
CPI
1.02
Float left
15d
Utility service
Switchgear
Cooling plant
Energize
Commissioning
Critical path · 3 of 5Data date
Our thesis

Most projects don’t fail in the field. They fail in the forecast.

01

The slip starts as float.

A late delivery rarely moves the finish on day one. It eats float quietly, until the critical path flips and the date goes with it.

02

Optimism compounds.

Every update that rounds progress up borrows from the next one. By the time SPI reads 0.85, the cheap recovery options are gone.

03

We measure it early.

Independent updates, earned value and risk analysis give leadership defensible data while there is still time to act on it.

20 yrs
Founder in complex programs
2021
Founded in Delaware
16
Controls and IT services
40
Confidential projects
Live demo · CPM

One late delivery. Watch it travel.

A sample data center schedule, eleven activities, real critical path math. Pick an activity, make it late, and see where the float goes and what the delay costs.

1 · Choose the late activity
Ready for service
Day 230
Finish moves
0 days
Float absorbed
0 days
Revenue at risk
$0
Site work and foundations15d float
Building shell and roof15d float
Switchgear delivery15d float
Generator deliveryCritical
Electrical rough-in15d float
Cooling plant and CRAHs45d float
Set and terminate switchgear15d float
Set generatorsCritical
Energize and backfeedCritical
Commissioning, L1 to L5Critical
Ready for serviceDay 230

Switchgear delivery has 15 days of float in the baseline. Add days and watch it disappear.

Critical pathHas floatFloatAdded delayBaseline finish
What we do

Plan it. Control it. Prove it.

16 services in four groups. Bring us in before the first activity is drawn, or the week the dates stop holding.

Featured projects

Proof, on schedule.

40 confidential projects across data centers, healthcare, infrastructure and industry. Owners stay private. The dates do not.

$980MHealthcare Trauma Center & Critical Care TowerA Level I trauma center rising beside the one it replaces. One integrated schedule keeps the helipad, the ICUs and the move-in weekend on the same critical path. U.S. Mid-Atlantic & Northeast640,000 SF · 12 stories52 monthsFinishing 2028$890MWater & Wastewater Combined Sewer Overflow Storage TunnelA tunnel boring machine advances a few dozen feet a day. Every one of those feet is measured against the baseline, so the river cleanup date stays real. U.S. Mid-Atlantic & Northeast3.1-mile tunnel · 2 shafts60 monthsFinishing 2028$2.4BData Centers Gigawatt-Scale AI Data Center CampusFour buildings, six hundred megawatts and tenants who signed for capacity by the quarter. Every week saved on the critical path is revenue the owner keeps. U.S. Mid-Atlantic & Northeast4 buildings · 600 MW54 monthsFinishing 2029$310MData Centers Powered Shell to Colocation Data Center ConversionAn empty shell turned into two live data halls in eighteen months. The first tenant moved in on the date in its lease. U.S. Southeast36 MW · 2 data halls18 monthsCompleted 2023$420MData Centers Data Center Campus Substation & Power DeliveryNo power, no data center. The substation was energized ahead of the first data hall, so the utility was never the reason for a late opening. U.S. Texas345 kV · 300 MW24 monthsCompleted 2026$1.3BSemiconductor 300mm Wafer Fab Cleanroom Fit-OutTool move-in is the date the whole fab is built for. Every cleanroom zone is scheduled backward from the first tool on its pad. U.S. West180,000 SF cleanroom34 monthsFinishing 2027$720MTransportation Highway Bridge Replacement ProgramTwenty-seven aging bridges, replaced in an order the traffic can survive. One program schedule decides which lane closes when. U.S. Mid-Atlantic & Northeast27 bridges48 monthsFinishing 2028$118MGovernment & Civic Emergency Operations & 911 CenterA 911 center cannot go dark for a single call. Cutover from the old floor to the new one was planned to the minute. U.S. Mid-Atlantic & Northeast85,000 SF hardened26 monthsCompleted 2025
Wale Osoba, Founder and Chief Executive Officer of AdenTurtonWale OsobaFounder and Chief Executive Officer
Why AdenTurton exists

My background in data center and infrastructure construction taught me that without disciplined controls, vision is just an estimate.

Wale Osoba, 20 years delivering complex programs

We don’t build the project. We ensure it is built on time and on budget.

Program Rates

Built it once? The next one costs less.

Another data hall, another clinic, another school in the same bond program? The WBS, logic library, cost codes, risk register and dashboards already exist. We put the same team on each repeat or similar project at a highly discounted Program Rate.

Project 1Full setupBuilt once
Project 2Program RateReused
Project 3Program RateReused
Project 4Program RateReused
Setup: WBS, logic, codes, templatesOngoing controls
Talk to a scheduler

Your forecast is a promise. Let’s keep it.

Send us the project, the schedule and the date that matters. A senior project controls lead replies within one business day.